Fabrication scope

30 m ceiling girder, fully bolted structures and roof columns.

Salem Automech Structures LLP carried out this structural fabrication scope for Talcher Thermal Power Project Stage III, 2 × 660 MW in Odisha. Production followed the approved drawings, applicable procedures and project inspection requirements.

Material preparation, fit up, welding, dimensional verification, surface preparation and dispatch were coordinated through the Salem workshop.