Fabrication capabilities

Proven fabrication range.

Ceiling girders, columns, FGD steelwork, welded beams and air and gas path assemblies—built to drawing. Tap a marker on the image for construction detail.

Ceiling girders structural fabrication reference visual
Product 01 of 09

Power structures

Ceiling girders

Material
IS 2062 E250 BR
Size range
Up to 12 m, 155 mm plate
Weld process
SAW to WPS
Application
Boiler ceiling support
0+Years of experience
0.0Acre facility
0 MTE.O.T. crane capacity
ISO9001:2015 certified

How an order moves through the shop

From drawing to dispatch.

Drawing & material

Fabrication drawings, material test certificates and weld procedures are checked against the order before cutting starts.

Cut & roll

Plate is profiled and formed on site — cutting up to 155 mm, rolling up to 50 mm.

Fit-up & weld

Components are fitted and welded to procedure, including submerged arc welding up to 1,200 Amps.

Inspect & test

Dimensions, welds and NDT are checked against the drawing at the required hold points.

Coat & dispatch

Surface preparation, coating and match-marking are completed before loadout, moved by 60 MT E.O.T. crane.